1. What is counted
Two kinds of water consumed, counted at the location where the model was served.
Why both: a vendor's cooling-only figure understates the footprint by about ten times. One median text prompt, six published answers:
- 0.12 mLGoogle, accelerators only
- 0.26 mLGoogle, cooling only
- 0.32 mLOpenAI, converted from the published figure
- 1.3 mLGoogle's energy plus US grid water
- 16.9 mLLi et al., scope 1 plus scope 2, US average
- 45 mLMistral, full lifecycle
Bar lengths are illustrative. The ten to one match covers the whole ladder.
2. Tokens to liters
Usage is counted in tokens, as providers bill it, and converted with published factors per model tier and region.
| Quantity | Version 1 factor | Basis |
|---|---|---|
| Output tokens | about 15 L per million | About 2.9 Wh per 1,000 tokens at 0.30 L/kWh on site plus 4.35 L/kWh for the grid (Jegham et al., Azure) |
| Input tokens | about 0.5 L per million | About 0.05 Wh per 1,000 tokens, same factors |
| Small models | about a third | GPT-4.1 nano, about 2.4 mL per 1,000 tokens |
| Reasoning models | an uplift | About 30 times the energy on average (AI Energy Score v2) |
Method: EcoLogits (server energy times on-site WUE plus PUE times off-site water intensity). Reference: ISO 14046. The derivation and sensitivity range are published with each version.
3. Verifying usage
Usage comes from data the provider generated, and every pull is reconciled to the company's accounts-payable list of AI vendors, so every account is counted.
Attested
Usage exports plus a signed attestation. Liters uplifted 25%.
API-verified
Monthly pulls from billing data, gateway keys or the signed collector you run yourself.
Audited
Limited assurance under ISO 14064-3, by your own auditor.
Companies keep their administrative API keys. Read-only exports, gateway keys and the signed collector carry the data.
4. The match
5. Delivered water
6. The badge
7. Governance
Public and free. Open to every organization that meets it, on a cost-based fee schedule. Developed with experts and stakeholders, a thirty-day comment period per version, certification decisions independent of fundraising, a published complaints and revocation procedure.
Version history
| Version | Date | Status |
|---|---|---|
| 1.0 draft | October 2026 | In drafting. Public comment opens with the pilot cohort. |